Production
A client order is broken down into stages from the tech map, each stage assigned to a specific worker. The heatmap shows the bottlenecks; the gantt shows the load for the week. Progress is calculated weighted by actual labor — not “3 of 5 stages closed”.
- Orders tied to clients and contracts
- Tech maps with materials and stages
- Production pipeline (drag-and-drop editor)
- Stage and worker workload heatmaps
- Gantt calendar of orders for the week / month
- Weighted progress by actual labor
- Stage log with assignees